GE (General Electric) Addis Ababa Office

Main Contractor : Mafer

Facilities: Office

Alama Engineering Services completed Air conditioning, ventilation works as well as electrical installations for the new HQ of General Electric in Addis Abba located at  SNAP plaza 6th floor (Bole Road).

 

The A/C system is an advanced VRF Toshiba-Carrier system with copper piping and gas refrigeration fitted with remote controllable heating/cooling fan coils indoor and outdoor condensers.

Electrical works consisted of installing power plugs, electrical switches, electric boards, lighting spots etc

1/21

© 2020 by H [2] M | Media

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
  • Google+ - Grey Circle
This site was designed with the
.com
website builder. Create your website today.
Start Now