top of page

GE (General Electric) Addis Ababa Office

Main Contractor : Mafer

Facilities: Office

Alama Engineering Services completed Air conditioning, ventilation works as well as electrical installations for the new HQ of General Electric in Addis Abba located at  SNAP plaza 6th floor (Bole Road).

 

The A/C system is an advanced VRF Toshiba-Carrier system with copper piping and gas refrigeration fitted with remote controllable heating/cooling fan coils indoor and outdoor condensers.

Electrical works consisted of installing power plugs, electrical switches, electric boards, lighting spots etc

bottom of page